1/13 Grand River Dam Authority News Release
At 10AM on Monday, January 13:
- Grand Lake elevation was 745.43 feet. Daily target elevation for January 13 is 742 feet.
- At the direction of the United States Army Corps of Engineers, five (5) main spillway gates were open at Pensacola Dam, discharging 39,649 cubic feet per second (cfs) of water.
- Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,268 cfs of water through generation.
- Releases through floodgates and generation totaled 50,917 cfs.
- Inflows into Grand Lake totaled 39,753 cfs.
- Lake Hudson elevation was 624.95 feet. Normal elevation is 619 feet.
- At the direction of the United States Army Corps of Engineers, two (2) gates were open at Robert S. Kerr Dam, discharging 20,742 cubic feet per second (cfs) of water.
- Four (4) units were online at the Robert S. Kerr Dam powerhouse, releasing 33,480 cfs of water through generation.
- Releases through floodgates and generation totaled 54,222 cfs.
- Inflows into Lake Hudson totaled 52,255 cfs.