
Grand River Dam Authority Floodwater Release Bulletin
For immediate release: 6/02/25
At 9:30 AM on Monday, June 2:
Grand Lake elevation was 745.95 feet.
At the direction of the United States Army Corps of Engineers, one (1) main spillway gate and (3) three east spill gates were open at Pensacola Dam, discharging 14,047 cubic feet per second (cfs) of water.
Six (6) units were online at the Pensacola Dam powerhouse, releasing 12,882 cfs of water through generation.
Releases through floodgates and generation totaled 26,929 cfs.
Inflows into Grand Lake totaled 9,852 cfs.
Lake Hudson elevation was 621.18 feet.
No floodgates were open at Robert S. Kerr Dam
No generation at the Robert S. Kerr Dam powerhouse.
Inflows into Lake Hudson totaled 27,622 cfs.
Additional information can be found by visiting: http://stormops.grda.tech/riveroperations
Originally published on 360GrandLake.com.
More GRDA Updates

Celebrating National Public Power Week 2026
Each year, during the first full week in October, the Grand River Dam Authority joins with the nation's 2,200 other publicly owned electric utilities to celebrate National Public Power Week. It is a t

Seasonal safety for cooler weather
The calendar has officially changed to fall, and the Oklahoma weather seems to be slowly changing too. While it may be a little early to park the lawnmower for the season, it's always a good time to t

Back to school with GRDA
As the new school semester gets underway, area students are returning to the classroom and once again studying reading, writing and arithmetic, along with history, science, and other subjects. With th
