GRDA Floodwater Release Bulletin: April 22, 2026 at 3:30 PM
For immediate release: 04/22/26
At 3:30 PM on Wednesday, April 22:
- Grand Lake elevation was 745.16 feet.
- At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 637 cubic feet per second (cfs) of water.
- Six units were online at the Pensacola Dam powerhouse, releasing 13,673 cfs of water through generation.
- Releases through floodgates and generation totaled 14,310 cfs.
- Inflows into Grand Lake totaled 8,018 cfs.
- Lake Hudson elevation was 620.70 feet.
- No floodgates were open at Robert S. Kerr Dam.
- Four units were online at the Robert S. Kerr Dam powerhouse, releasing 32,130 cfs of water through generation.
- Inflows into Lake Hudson totaled 15,102 cfs.
Real time data can be found by visiting: http://stormops.grda.tech/riveroperations
News release from the Grand River Dam Authority.
More GRDA Updates

Electric safety tips for Halloween
While Halloween is meant to be both a fun and scary season, the Grand River Dam Authority wants to help ensure that the fun part stands out the most. With that in mind, here are a few Halloween-relate

From the GRDA history files
Completing the Pensacola powerhouse It was 86 years ago this week - October 23, 1940 - when the Massman Construction Company out of Kansas City, Missouri officially completed one of the most important

Wrapping up the rodeo
The Oklahoma men and women who maintain the power lines for our state's publicly owned electric utilities came together in Ponca City in early October (1st and 2nd) for two days of competition and com