GRDA Floodwater Release Bulletin: July 1, 2026 at 12:15 PM
For immediate release: 07/01/26
At 12:15 PM on Wednesday, July 1:
- Grand Lake elevation was 750.08 feet.
- At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 6,765 cubic feet per second (cfs) of water.
- Six units were online at the Pensacola Dam powerhouse, releasing 12,769 cfs of water through generation.
- Releases through floodgates and generation totaled 19,534 cfs.
- Inflows into Grand Lake totaled 10,110 cfs.
- Lake Hudson elevation was 626.78 feet.
- No floodgates were open at Robert S. Kerr Dam.
- Four units were online at the Robert S. Kerr Dam powerhouse, releasing 32,400 cfs of water through generation.
- Releases through floodgates and generation totaled 32,754 cfs.
- Inflows into Lake Hudson totaled 20,552 cfs.
Real time data: http://stormops.grda.tech/riveroperations
News release from the Grand River Dam Authority.
More GRDA Updates

Cooking a Thanksgiving feast? Keep these safety tips in mind
With Thanksgiving Day 2026 fast approaching, many are planning to spend a lot of extra time in the kitchen in the very near future. If that is your plan, the Grand River Dam Authority wants to make su

Proud of our veteran team
As we celebrate Veteran's Day 2026, the Grand River Dam Authority once again uses this space to recognize a significant portion of our workforce that previously served in the United States Armed Force

Boating and floating safety tips for the fall season
It is typical practice to share boating safety and lifejacket tips in the spring and summer months, during the midst of the busy boating and floating season on Grand River Dam Authority lakes and the