Grand River Dam Authority Floodwater Release Bulletin

For immediate release: 4/24/25

At 10:45 AM on Thursday, April 24:

  • Grand Lake elevation was 748.63 feet.

  • At the direction of the United States Army Corps of Engineers, four (4) main spillway and two (2) east spillway gates were open at Pensacola Dam, discharging 50,448 cubic feet per second (cfs) of water.

  • Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of water through generation.

  • Releases through floodgates and generation totaled 63,669 cfs.

  • Inflows into Grand Lake totaled 21,639 cfs.

  • Lake Hudson elevation was 628.24 feet.

  • Fifteen (15) floodgates were open at Robert S. Kerr Dam, discharging 43,323 cfs of water.

  • Three (3) units were online at the Robert S. Kerr Dam powerhouse, releasing 25,380 cfs of water through generation.

  • Releases through floodgates and generation totaled 68,703 cfs.

  • Inflows into Lake Hudson totaled 65,250 cfs.

Additional information can be found by visiting: http://stormops.grda.tech/riveroperations

Grand Splash Marketing

Our mission is simple but powerful: to propel your brand to new heights. We understand that in today's fast-paced, digital-first world, your online presence can make or break your business. That's why we're dedicated to crafting dynamic, data-driven marketing strategies that yield results. Your success is our success, and we're here to guide you every step of the way.

https://GrandSplashMarketing.com
Previous
Previous

Grand River Dam Authority Floodwater Release Bulletin

Next
Next

Grand River Dam Authority Floodwater Release Bulletin